Below are some examples of previous projects of domestic roofs in various stages of completion.  

Before installation.

Before installation.

IMG_1252.jpeg
After installation of Signature plain tiles In Sherwood finish.

After installation of Signature plain tiles In Sherwood finish.

IMG_1533.jpeg
Treated timber battens and GRP dry valley.

Treated timber battens and GRP dry valley.

Mortared hip bonnets.

Mortared hip bonnets.

The finished roof.

The finished roof.

IMG_4351.jpeg
IMG_4359.jpeg
IMG_4360.jpeg
Michelmersh handmade tiles in multi-red.

Michelmersh handmade tiles in multi-red.

Freshly mortared Verge.

Freshly mortared Verge.

IMG_1321.jpeg
IMG_1594.jpeg
Exposed rafters of a triple oak-framed garage.

Exposed rafters of a triple oak-framed garage.

Breathable membrane and SRT treated batten waiting for tiles.

Breathable membrane and SRT treated batten waiting for tiles.

Signature plain tiles in Sherwood finish. Hip tiles installed using dry hip ventilation system.

Signature plain tiles in Sherwood finish. Hip tiles installed using dry hip ventilation system.

The finished roof.

The finished roof.

IMG_1429.jpeg
IMG_1427.jpeg
IMG_3065.jpeg
IMG_3067.jpeg
Marley Modern concrete interlocking tiles in smooth brown with contrasting grey dry verges.

Marley Modern concrete interlocking tiles in smooth brown with contrasting grey dry verges.

IMG_0229.jpeg
Marley Ludlow plus tiles in granular brown.

Marley Ludlow plus tiles in granular brown.

IMG_0221.jpeg
The existing bay window peg tiles were looking worse for wear. This particular bay window was situated on a property located within the grounds of Salisbury cathedral.  All works needed to be approved by a conservation officer prior to starting.

The existing bay window peg tiles were looking worse for wear. This particular bay window was situated on a property located within the grounds of Salisbury cathedral.
All works needed to be approved by a conservation officer prior to starting.

Tiles stripped back to bear timbers.

Tiles stripped back to bear timbers.

Insulation was added.

Insulation was added.

Plywood base added

Plywood base added

Breathable membrane installed.

Breathable membrane installed.

Salvaged peg tiles re-instated, fixed with stainless screws and dressed lead.

Salvaged peg tiles re-instated, fixed with stainless screws and dressed lead.

The finished, refurbished bay window of the listed property.

The finished, refurbished bay window of the listed property.